Our standard: every site we build loads in under 2.5 seconds on mobile data.

Build

Mobile applications

Android-first, built for intermittent connectivity and low-end devices. It works offline where it has to, and syncs when the signal comes back, because the field is where it will be used.

Indicative
On scope
Typical timeline8–16 weeks
Deposit50% to start
Source codeYours at handover
SupportCare Plan from KES 14,000/mo
Discuss a build

Who this is for

Your people work where the signal does not. An app that needs a connection to record anything is an app that records nothing, and the data arrives late, by WhatsApp, retyped.

Field data collection

Enumerators recording offline all day, syncing once when they reach town.

Inspection and compliance

A checklist, photographs and a signature captured on site and filed automatically.

Member-facing services

Balances, statements and requests on the phone people already own, not the one they do not.

Internal operations

Stock, deliveries or attendance recorded where they happen rather than at a desk hours later.

What you get

Offline-first, not offline-tolerant

The local database is the source of truth on the device; sync is a background job, not a prerequisite.

Conflict handling that is decided

What happens when two people edit the same record is designed, not discovered in production.

Built for a low-end device

Tested on the phones your users actually carry, not on the newest one in the office.

Play Store release handled

Listing, signing, staged rollout and the update pipeline, in your own developer account.

Crash reporting from day one

You find out a build is broken from the dashboard, not from a user.

Source code and documentation

In your name, in your repository. You are never locked in to us.

How the build runs

Each stage ends with something you can open, and a decision you have to make. No month of silence.

  1. 01

    Field scoping

    Where the app is used, on what device, on what connection, and what has to work with none.

    1–2 weeks
  2. 02

    Data and sync design

    The local model, the sync rules and the conflict policy, agreed before any screen is built.

    1 week
  3. 03

    Build in two-week blocks

    An installable build at the end of each block, on a real device, in real conditions.

    4–10 weeks
  4. 04

    Field trial

    A small group uses it for real work while the old process still runs.

    2 weeks
  5. 05

    Release and handover

    Store listing, rollout, crash reporting, documentation and training.

    1 week

What we need from you

Three things, and a project runs on time.

Most delays are not technical. They are a decision nobody was able to make, or data nobody could find.