Our standard: every site we build loads in under 2.5 seconds on mobile data.

Transform

Systems integration

Connecting the software you already pay for (accounting, CRM, SMS, payments, HR) so the same number stops being typed into three places.

Indicative
On scope
Typical timeline2–8 weeks
Deposit50% to start
Source codeYours at handover
SupportCare Plan from KES 14,000/mo
Discuss a project

Who this is for

Every system in the organisation works. None of them talk. Somebody re-keys the same figure three times a week, and the three copies have quietly stopped agreeing.

Sales into accounting

Invoices raised once, in the system that should raise them.

A website into a CRM

Enquiries arriving where they will be followed up, with their source attached.

Payments into a ledger

Transactions posted automatically, with the exceptions queued rather than lost.

Anything into SMS

Notifications sent from the event that should trigger them, not from a person remembering.

What you get

An integration map

What talks to what, in which direction, and which system owns each field.

Error handling that is designed

Retries, backoff, dead-letter queue, and a human path for what cannot be automated.

Monitoring

You find out an integration has stopped from an alert, not from a missing invoice.

Idempotency

The same event arriving twice does not create two records.

A runbook for your team

What to do when a message fails, written for the person who will actually be there.

Source code and documentation

In your name, in your repository. You are never locked in to us.

How the build runs

Each stage ends with something you can open, and a decision you have to make. No month of silence.

  1. 01

    Integration map

    Systems, fields, directions and owners. Usually reveals a duplicate nobody knew about.

    1 week
  2. 02

    Contract design

    What each message contains, what happens when it fails, and who is told.

    1 week
  3. 03

    Build

    One integration at a time, each one live before the next is started.

    1–5 weeks
  4. 04

    Parallel run

    Automated and manual in step until the two agree for a full cycle.

    1–2 weeks
  5. 05

    Handover

    Runbook, monitoring access, and the code in your repository.

    1 week

What we need from you

Three things, and a project runs on time.

Most delays are not technical. They are a decision nobody was able to make, or data nobody could find.